Projects

text
  • Coke chemistry

  • Metallurgy

AZOVSTAL IRON AND STEEL WORKS Ukraine, Mariupol

Period

Scope of work

List of works

2011 – 2015

Hot repair of coking chamber walls

Repair of coking chambers heating walls. Anchorage replacement. Start-up and adjustment works.

YASINOVSKY COKE PLANT Ukraine, Makeyevka

Period

Scope of work

List of works

2006

Equipment installation

Construction and installation works on the Dust-free coke dispensing unit.

2006 — 2007

Capital construction

Construction and installation works.

2007

Refractory works

Flameless heater rebricking.

2010 — 2011

Capital construction of coke oven battery No. 4

Refractory masonry of coking chamber heating walls, installation, start-up and adjustment works, installation, dismantling of overall housings, installation and adjustment of coke oven machines.

ZAPOROZHCOKE Ukraine, Zaporozhye

Period

Scope of work

List of works

2005 – 2020

Overhaul repairs of coke battery No. 2,5,6

Repair of coking chambers heating walls Anchorage replacement. Start-up and adjustment works.

2012, 2017, 2019

Aerating plant repair

Replacement of saturator platforms, replacement of pipelines and isolation valves, replacement of heater and circulation pot, replacement of lining of saturator equipment. Start-up and adjustment works.

2016 – 2020

Replacement of service platforms from the coke and machine sides

Dismantling of existing platforms, manufacture, installation, pouring with concrete, laying of half-timbered wall, replacement of half-timbered columns.

2018

Dismantling of existing platforms, manufacture, installation, pouring with concrete, laying of half-timbered wall, replacement of half-timbered columns.

Manufacture and installation of water collectors. Manufacture and installation of pipeline units in the tunnel and at the top of the Сoke oven battery No. 2. Installation and connection to the mini riser system. Start-up and adjustment works.

2018

Coke oven battery No. 5,6. Overhaul of the coke wharf.

Dismantling works. Installation of the longitudinal bearing beam, casting and lining of the reinforced concrete slab.

ALCHEVSK COKE PLANT Ukraine, Alchevsk

Period

Scope of work

List of works

2005 – 2007

Capital construction of coke oven battery No. 10-BIS

Refractory masonry of coking chamber heating walls, installation, start-up and adjustment works, installation, dismantling of overall housings, installation and adjustment of coke oven machines.

2007 – 2008

Equipment installation

Lining of mobile mixers.

YUZHKOKS Ukraine, Kamyanske

Period

Scope of work

List of works

2018 – till present

Overhaul repairs of coke oven battery No. 5,6

Repair of coking chambers heating walls. Installation works. Start-up and adjustment works.

2018 – 2021

Machinery and equipment installation

Installation and start-up and adjustment works of the coke pusher.

2018 – 2021

Machinery and equipment installation

Installation and start-up and adjustment works of the door lifter.

2018 – 2021

Machinery and equipment installation

Installation and start-up and adjustment works of the coal charging machine.

MAKIYIVKA COKE PLANT Ukraine, Makeyevka

Period

Scope of work

List of works

2007 – 2008

Overhaul repairs of coke oven battery No. 4

Refractory masonry of coking chamber heating walls, installation, start-up and adjustment works, installation, dismantling of overall housings, installation and adjustment of coke oven machines.

2009 – 2012

Repair works

Construction and installation works of the Wet catalysis department of the Desulfurization shop.

2011

Installation works

Dismantling, installation and adjustment of the Chemical cleaning department.

2010 – 2013

Hot repair

Repair of boiler equipment.

2011 – 2012

Installation works

Repair of the turbogenerator department.

DKHZ Ukraine, Kamyanske

Period

Scope of work

List of works

2008 – 2011

Overhaul repairs of coke oven battery No. 1-Bis

Repair of coking chambers heating walls. Installation works. Start-up and adjustment works.

2019 – till present

Overhaul repairs of coke oven battery No. 5

Repair of coking chambers heating walls. Installation works. Start-up and adjustment works.

2020

Machinery and equipment repair

Adjustment and installation of coke guide with autonomous, mobile, local dust suppression system.

2019 – till present

Replacement of service platforms from the coke and machine sides of the coke oven battery No. 5, 1

Dismantling of existing platforms, manufacture, installation, pouring with concrete.

ARCELORMITTAL Ukraine, Krivoy Rog

Period

Scope of work

List of works

2013 – 2014

Overhaul repairs of coke oven batteries

Dismantling and rebricking of coking chambers heating walls. Installation works. Start-up and adjustment works.

2017

Machinery and equipment installation

Installation and start-up and adjustment works of the coke pusher.

YENAKIEVE COKE PLANT Ukraine, Yenakiyevo

Period

Scope of work

List of works

2013

Overhaul repairs of coke oven battery No. 4

Dismantling and rebricking of coking chambers heating walls. Installation works. Start-up and adjustment works.

2013

Installation works

Installation works

AZOVSTAL IRON AND STEEL WORKS Ukraine, Mariupol

Period

Scope of work

List of works

2017 — 2022

Stoves repair

Replacement of m/s and re-laying of refractory masonry of stoves and dust collector.

2007 — 2017

Lime furnaces repair

Rebricking. Start-up and adjustment works.

2009 -2017

Continuous furnaces repair

Rebricking. Start-up and adjustment works.

2009 — 2011

Mixers repair

Rebricking. Start-up and adjustment works.

2009 — 2010

Open-hearth furnaces repair

Rebricking. Start-up and adjustment works.

UKRGRAFIT Ukraine, Zaporozhye

Period

Scope of work

List of works

2008

Hot repair

Graphite furnace rebricking. Start-up and adjustment works.

INTERPIPE - NIZHNEDNEPROVSK PIPE ROLLING PLANT Ukraine, Dnipro

Period

Scope of work

List of works

2011

Lining works

Lime furnace lining.

DMK Ukraine, Kamyanske

Period

Scope of work

List of works

2019

Blast furnace repair

Rebricking. Start-up and adjustment works.

YENAKIIEVO IRON AND STEEL WORKS Ukraine, Yenakiyevo

Period

Scope of work

List of works

2013

Stoves repair

Rebricking. Start-up and adjustment works.

DONETSK METAL ROLLING PLANT Ukraine, Donetsk

Period

Scope of work

List of works

2012 – 2013

Installation of the lining of the furnace with a walking hearth for balls

Refractory masonry, concrete mix installation. Materials provided by «Calderys», the project made by «Forni E Combustione».

2011

Installation of furnace lining of pusher-type

Refractory masonry, concrete mix installation. Materials provided by «Calderys», the project made by «Forni E Combustione».

Period

Scope of work

List of works